This tutorial details the two methods that can be used to schedule the launching of a test at any given time.
The the "Scenarios" tab in the
"Runtime" section, select the scenario to be launched,
then click on the "Advanced..." button. In the
"Schedule a test" tab, enable scheduling for the test
and enter the time and date for its launch. You may also specify whether
or not the test should be repeated (e.g. every week).

![]() | Note |
|---|---|
NeoLoad must be running for the test to start at the specified time. |
See the section called “Scheduling a test” for more details.
You may use your operating system's task scheduler to run NeoLoad using a command line (see the section called “Running the Controller”). Once the test is completed, you may analyze the results using NeoLoad's graphical user interface. Furthermore, by using the option to generate a report in HTML, PDF or XML format, the results then can be automatically processed, in particular when the XML format report is used.